翻訳と辞書
Words near each other
・ Ust-Kamchatsk
・ Ust-Kamchatsk Airport
・ Ust-Kamchatsky District
・ Ust-Kamenogorsk Hydroelectric Power Plant
・ Ust-Kan
・ Ust-Kansky District
・ Ust-Kara
・ Ust-Karsk
・ Ust-Katav
・ Ust-Kishert
・ Ust-Kishert, Perm Krai
・ Ust-Koksinsky District
・ Ust-Kubinsky District
・ Ust-Kulomsky District
・ Ust-Kut
Ust-Kut Airport
・ Ust-Kutsky
・ Ust-Kutsky District
・ Ust-Kuyga
・ Ust-Kuyga Airport
・ Ust-Labinsk
・ Ust-Labinsky
・ Ust-Labinsky District
・ Ust-Luga
・ Ust-Luga Multimodal Complex
・ Ust-Maya
・ Ust-Maya Airport
・ Ust-Maysky District
・ Ust-Mil
・ Ust-Nera


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ust-Kut Airport : ウィキペディア英語版
Ust-Kut Airport

Ust-Kut is an airport in Irkutsk Oblast, Russia located 9 km north of Ust-Kut. It services small and medium-range airliners. The main regular destination is Irkutsk. Principal owner of the airport - JSC "UTair Aviation" (76.66% of shares). In the future, it will be converted into the main base of UTair Aviation in Eastern Siberia.
== Future expansion ==
The company "UTair Aviation" in 2007, becoming the controlling shareholder of the airport, announced its intention to build a new airport terminal and lengthen the runway to make a first-class aircraft.〔(The report the mayor of Ust-Kut municipality in 2007 ) // Lenskie Vesti. — 2008. — 4 April. — № 13.〕 The company has adopted a plan of the airport reconstruction in 2009-2015, involving:
artificial reconstruction of the runway for the reception at the airport in Ust-Kut aircraft Tupolev Tu-154 and other aircraft first-class;
reconstruction of the airport and bring its capacity up to 150 people per hour;
replacement of obsolete equipment and special vehicles.
In a subsequent plan to build a new parking lot for the Tupolev Tu-154, the new premises rescue station and replace the light-signaling equipment means aircraft landing.〔(Ust-Kut Airport: there are prospects for development ) // Lenskie Vesti. — 2008. — 15 August. — № 32.〕
Reconstruction plan for the airport is included in the federal program of revival of significant airports, but in 2009 the airport "Ust-Kut" is "not necessarily important for the partners." Despite this, according to the General Director of JSC "Ust-Kut Airport" by Yuri Samorokov, it is expected that full-scale reconstruction would still be carried out in 2015.
Economic prospects are directly linked to the prospects of development of large oilfields (Verkhnechonskoye, Yarakta, Dulisminskoye, Talakan, etc.) and operation of Eastern Siberia – Pacific Ocean oil pipeline.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ust-Kut Airport」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.